2017 Campus Projects

Project dates: April – January 2018

Cost: $1,470,070

Summary: The project was undertaken to:

  • reconstruct Adriance Lab Road and Horticulture Road in concrete;
  • add sidewalks and buffered bike lanes to both sides of Adriance Lab Road;
  • add compliant accessible ramps at all crosswalks along Adriance Lab and Horticulture Roads;
  • construct a sidewalk along the east side of Discovery Road between John Kimbrough Boulevard and Horticulture Road;
  • add crosswalks on Discovery Road where it intersects with Enterprise Avenue and at West Campus Boulevard;
  • reconstruct the entrances to Lots 18 and 98;
  • add campus standard lighting along the length of the project;
  • add improved drainage to Adriance Lab Road;
  • extend the multi-use path currently on Horticulture Road to the east to connect to other west campus infrastructure.

Before:

Adriance Lab Before Construction

Adriance Lab Before Construction

Adriance Lab Before Construction

Adriance Lab Before Construction


After:

Adriance Lab After Construction

Adriance Lab After Construction

Adriance Lab After Construction

Adriance Lab After Construction

Read more about the Adriance Lab project  


Completed: December 2017

Cost: $250,266

Summary: The project resurfaced Lot 104 and added dedicated motorcycle parking.

Before:

Lot 104 Before Construction

Lot 104 Lab Before Construction

Lot 104 Lab Before Construction


After:

Lot 104 Lab After Construction

Lot 104 Lab After Construction

Completed: December 2017

Summary: The project repaired several damaged sections of Old Main Dr. and Houston St.

Before:

Old Main Dr. Before Construction

Old Main Dr. Before Construction


After:

Old Main Dr. After Construction

Old Main Dr. After Construction

Completed: December 2017

Summary: The project repaired several damaged sections of Olsen Blvd.

Before:

Olsen Blvd. Before Construction


After:

Olsen Blvd. After Construction

Olsen Blvd. After Construction

Olsen Blvd. After Construction

Completed: December 2017

Cost: $328,000

Summary: The project removed and replaced Lot 27, which services Buetel Hall, added drainage and lighting and improved adjacent landscaping

Before:

Lot 27 Before Construction


After:

Lot 27 After Construction

Lot 27 After Construction

Lot 27 After Construction

Completed: December 2017

Summary: The project repaired several damaged sections of Throckmorton St.

Before:

Throckmorton St. Before Construction


After:

Throckmorton St. After Construction

Completed: December 2017

Summary: The project repaired a damaged section of the UCG lintel.

Before:

Throckmorton St. Before Construction


After:

Throckmorton St. After Construction


Lot 97

Motorcycle parking added to Lot 97

Motorcycle sign in Lot 97

Motorcycle parking spaces in Lot 97